Norton V2112 Thermalbond 3/8" X 3/8" 2-side Blk Glazing Gasketing 25' X 23 Rolls

US $149

  • Pottstown, Pennsylvania, United States
  • Jun 14th
560' SAINT GOBAIN NORTON V2112 THERMALBOND 3/8" X 3/8" 2-SIDED BLACK HIGH DENSITY POLYURETHANE FOAMTAPE GLAZING GASKETTING- 23 ROLLS EACH 25' LONG PLEASE SCROLL DOWN- MORE PHOTOS BELOW! THIS AUCTION IS FOR 560' (23 ROLLS OF 25' EACH) OF SAINT GOBAIN NORTON V2112 THERMALBOND 3/8" X 3/8" 2-SIDED BLACK HIGH DENSITY POLYURETHANE FOAMTAPE GLAZING GASKETTING . THIS "NORTON TAPE" HAS ACRYLIC ADHESIVE ON BOTH SIDES . USED FOR SSG TYPE GLAZING CONSTRUCTION . THIS WILL BE SHIPPED FREE TO ANYWHERE IN THE CONTINENTAL US IN ITS ORIGINAL BOX .   BOX HAS BEEN OPENED AND I HAVE ADDED THREE ROLLS TO THE ORIGINAL TWENTY.  THE ADHESIVE ON THIS MATERIAL APPEARS FRESH AND STICKY .  SOLD AS NEW AND BUYER HAS A 14 DAY RIGHT OF RETURN (NO SHIPPING REIMBURSED).STORAGE LOCATION-- BTH-2S; UG-4APPLICATION INSTRUCTIONS SINGLE/DOUBLE SIDED MOUNTING TAPES To ensure maximum adhesion of your product you must carry out the following steps. 1. Always test all products under actual application conditions prior to commercial use. 2. Material should be stored at 21oC (70oF). 3. Product must be applied at the application temperature recommended on the product data sheet. This should be a minimum of 20oC(68oF). If a temperature-controlled environment is not obtainable in cold weather, a hair dryer may be used to warm the product and the contact surface. 4. For maximum adhesive performance, preparing the contact surface correctly is crucial. Always prepare the contact surface by removing dirt, wax or moisture with a cleaning solvent. A typical cleaning solvent is a 50/50 isopropyl alcohol/water mixture. For added adhesion, it may be necessary to seal and/or prime the contact surface with Saint Gobain’s Tite-R-Bond. 5. Peel a fraction of the liner from the tape and stick this to the surface. Continue to apply the tape to the first surface while pulling the liner back at the same time. When all tape is applied firmly rub down with full pressure to ensure full adhesive-to-surface contact. 6. Although bond strength is dependent on the substrate surface, application temperature and dwell time, it is recommended that 24 hours dwell time at room temperature be allowed before loading. DOUBLE SIDED FOAM TAPES 5. Apply the tape to the first surface with the liner on, and then firmly rub down. Remove the liner just prior to bonding surfaces together and apply full pressure to ensure full adhesive-to-surface contact. 6. Although bond strength is dependent on the substrate surface, application temperature and dwell time, it is recommended that 24 hours dwell time at room temperature be allowed before loading. -------------------------------------------------------------------------------- Shipping cost is FREE TO ANY US location. Others-- Please see calculated figures. CK MY OTHER ADS TO SEE MORE INTERESTING ITEMS. THE PICTURES IN MOST OF MY ADS ARE THE EXACT ITEMS YOU WILL RECEIVE. --------------------------------------------------------------------------------

Directions

Similar products from Caulk & Sealants

People who viewed this item also vieved

By clicking "Accept All Cookies", you agree to the storing of cookies on your device to enhance site navigation, analyze site usage, and assist in our marketing efforts.

Accept All Cookies