US $14.95
Condition: |
New: A brand-new, unused, unopened, undamaged item in its original packaging (where packaging is
applicable). Packaging should be the same as what is found in a retail store, unless the item is handmade or was packaged by the manufacturer in non-retail packaging, such as an unprinted box or plastic bag. See the seller's listing for full details.
...
|
Brand | Gardner Bender |
Model | GET-3206 |
Directions
Similar products from Voltage Testers, Multimeters, Amp & Voltmeters
PANEL METER ac amperes 0-200 new unused
Heathkit model v-7 a vacuum tube voltmeter
AIRSERCO 6800 START-O-METIC 110/220V-AC ANALYZER B322257
DC 0-100V LED Panel Voltage Meter 3-Digital Display Voltmeter Motorcycle
FLUKE TRUE - RMS CLAMP METER 323 NEW
Vintage Simpson Electric Voltmeter Model 260 ROLL CASE MISSING TOP
Vtg Airserco DUAL Range AC Volt AMMETER Assembly w/INSTRUCTIONS NR punk electric
2V 12V 20V LED SOLAR PANEL METER BATTERY GAUGE VOLTMETER 4 BOAT TRUCK MPV SUV RV
12V DC Car Digital Electric Clock °F Temperature Voltage Measure White LED Gauge
GE HOUR METER 240V, 60 Catalog No. 50-235102ABAA1
IDEAL 61-763 TRUE RMS Digital Clamp On Ammeter with Leads and Case
AC 80~300V 100A Digital DUAL LED Volt Amp Combo Panel Meter+Current Transformer
100-300V/100A Digital AC Volt Ampere Meters+Voltage Current Sensing Transformer
5 in 1AC264V100A Digital Combo Panel Meter Volt Amp kWh Watt Working Time + CT
Digital Electronic Volt Meter Tester 80-500V AC Voltage Measuring LCD Voltmeter
0-200V DC Digital Volt Meters Voltmeter Gauge Red LED Negative Voltage Detetor
Keithley Instruments Model 621 Analog Electrometer - Nice
Vintage Triplett Ammeter model 327-T 0-150 milliamps DC
Digital Amperemeter Voltmeter DC 10A/200V Voltage Monitor Current Tester Red LED
People who viewed this item also vieved
GENTEC JOULEMETER ED-200 LASER POWER METER HEAD
GENTEC ETI JOULEMETER MODEL JM-21 (GT1)
BIRD 43 WATTMETER SLUG: 5D, 200-500 MHz, 5 Watt element uhf 450
Fieldpiece Superheat and Subcooling Model No. SSX34
The LAMBRECHT Vane Anemometer Wind Meter 1400 Super New Condition-made in 1984
Liquid Level Column View Gage From Gits Manufacturing
FLUKE 845AR HIGH IMPEDANCE VOLTMETER-NULL DETECTOR 230 VAC
ABB Kilowatthours Meter D5B-8F E8F2CLE7BA**240V,60Hz**Great Cosmetic Condition!$
Siemens 9350DC-100-0NZZZA Access Power Meter (ION) Tested, Powers Up Great!
6pc IIT Non Marring Pry & Trim Tools Set Curved Long Short Wedges Flexible 50015
RED LION PAXI0020 Counter Ratemeter, 6 Digits, Red LED. USB Interface
THERMALOGIC DINFJ34H6-N-N-01 0-1000C 24VAC TEMPERATURE CONTROLLER
Red Lion Real Time Clock #APLCK000 New In Original Packaging
NEW Peak DCA55 Atlas Semiconductor Tester from JAPAN
Honeytek A6013L Capacitor Tester New Gift
Vintage Steampunk Microamperes gauge meter Tested
Extech HD450 Light Meter Datalogging
Minolta Handheld Chroma Meter. Xy -1 XY-DC. LUX/10.76=FC
PYLE Meters PCTL01 Pipe Clamp Temperature Lead
By clicking "Accept All Cookies", you agree to the storing of cookies on your device to enhance site navigation, analyze site usage, and assist in our marketing efforts.
Accept All Cookies