W2Q Pneumatic Heavy Duty Connector Crimping Tools Operation Guide(M22520/1-01,AWG12-26) CE Approval 1. Application and Feature * This pneumatic crimping tools to meet
495025.41.86 Natural 1000FT/REEL 06/14/11 Revise print legend & attn / GT 01/18/11 Chg spec from UL to ETL / GT 03/11/10 Update specs and chg print from HHT to GCC / GT 11/26/08 Change jacket wall thickness and OD - ALT 11/28/05 Update to Helix/Hitem
TK0269 General Electric GE Model No. THFP363 QMR363 THFP Fusible Interrupter 100 Amp - 600 VAC - 3 Pole - Type QMR Each item is guaranteed to be fully operational and in great condition unless otherwise noted. Includes mounting hardware Type 1 Enclosure Horse Power Ratings: 600V - 3 PH - Std.
This fixed price sale is for one new Siemens Power Mod Residential Metering Stacks Cat # WMM62225J WMM = Residential Metering Stack 6 = 6 position metering stack 2 = Three Phase in, S
Opened but brand new and in great condition! Retail price of $1800+ Buy it here and save several hundred dollars! 100% positive feedback and been selling for over ten years!
TK0326 Square D I-Line Catalog # HCW-2359-6 HCW I-Line MLO Panelboard 600 Amp - 600 VAC - 250 VDC - 3 Phase 4 Wire Each item is guaranteed to be fully operational and in great condition unless otherwise noted. Panel Catalog No. HCW-2359-6 22.5" of space for F and K frame breakers 22.5" of space for F, K, and L frame breakers Type 1 Enclosure Box - HC4259DB Approximate Dimensions: 9.
VLB348-ST Boltswitch Pressure Contact Switch 1200 Amp 600 Volt 120, 208, 240V Shunt Trip Black Back Plate Sold used electrically OK. Fuses sold separately. EMSCO # SW-2013-19720 LOC: 2A3
Normal cycle does not include shipping timePCB sample regular delivery is as follows:Layer 2 samples - 2-3 days4 layer samples - 4-5 days6 layer model - 5-7 days8 layer model - 9 days10 layer model - 12 days12 ~ 22 layer model - 18 days We offer you service, if you need, we will provide the fast production time 24 hours a day. PCB production regular delivery is as follows:Double panel production;3-10 square meters. The production time is 4 to 6 days10 to 30 square meters.
By clicking "Accept All Cookies", you agree to the storing of cookies on your device to enhance site navigation, analyze site usage, and assist in our marketing efforts.